Company

Gebrüder Weiss, Lauterach

Heat and cold emission via induction diffusers installed in the raised floor with primary air supply.

The goal:

  • Building services should ensure that specified room air conditions of 22° to 26° C are maintained
  • Heating and cooling operation guaranteed all year round
  • The comfort limits for temperature, air velocity, CO2content of the air must be observed

Our solution:

  • Cooling and heating supply by means of a reversible heat pump system
  • Free cooling operation with a groundwater system for direct cooling as well as for waste heat dissipation in chiller mode
  • Dual use of the heat pump system in the transition period
  • Heat and cold emission by means of floor induction units or floor fan coils along the facade in the raised floor
  • Ventilation system with heating and cooling function
  • 2 x ground water pumps
  • max. evaporator capacity winter heating mode: 170 kW 
  • Annual heating energy quantity: 300,000 kWh/a 
  • Annual cooling energy quantity: 300,000 kWh/a 
  • max. inlet temperature insurance 20° C 
  • Total heating load approx. 200 kW
  • Total cooling load approx. 180 kW

Your contact person

Gerfried Kreuzberger

Gerfried Kreuzberger

Head of Project Management

E-Mail: g.kreuzberger@intemann.at Tel.: +43 (0)5574 85444-27 vCard

Your contact person

Hubert Rädler

Hubert Rädler

Managing Director & Head of Sales

E-Mail: h.raedler@intemann.at Tel.: +43 (0)5574 85444-62 vCard


Heating and Cooling Coils
Floor Induction Diffusers
Heating/Cooling
Gebrüder Weiss, Lauterach